The design team used the SketchUp model created for the

[复制链接]

12

主题

0

回帖

42

积分

新手上路

Rank: 1

积分
42
shahadat112 发表于 2024-2-14 18:01:42
IM process to develop the hotel's interior design and bill of materials, as well as guide the manufacturing process. After construction, the D model was delivered to the building maintenance team to be used throughout the hotel's life cycle. Wow, no time was wasted and there was no need to repeat any type of work! Your modeling methodology is the key. It is essential to build the model according to the requirements of the project's BIM process to ensure that your model delivers the specific data needed for your project. During the design phase, the team created the models with the necessary precision to make efficient estimates in time and quantities of necessary materials, which allowed them to move directly to the acquisition of these. Anticipate the risks. The BIM process helps avoid risks before they happen.

The D model was complemented by scanned site data, in D and in the cloud, allowing uninterrupted use of the model to generate error analysis reports throughout the project. The design team also conducted conflict detection prior to design development to identify and resolve conflicts early. Achieve digital precision for your model with Hungary Phone Number List scanning and Trimble's robotic total station. For the hotel project, the interior design team creatednas-built structural model based on laser-scanned point cloud data. BIM models were developed around the existing structure, then exported for jobsite design using Trimble's robotic total station and FieldLink software. Use a comprehensive cloud-based design platform for BIM management and implementation across the entire lifecycle.



All interested parties could have access to the BIM model corresponding to the hotel and its data; In other words, all information was synchronized and shared. BIM project administration organizational chart BIM project administration organizational chart Construction plan Construction plan Highlights on workflow, software, and hardware Highlights on workflow, software, and hardware Point Cloud Scanning: Ensure Model and Site Congruence This project used a Trimble scanner to capture millions of points around the project under construction. Due to the site conditions and the enormity of the project, the point cloud scan of the hotel under construction was formed into segments of the building, separated by floor. Subsequently, the dimensions and structural elements derived from the Schematic Interior Design Model were adjusted based on the point cloud data to form an accurate basis for the detailed interior and mechanical, electrical and plumbing (MEP) models. Expected site issues with scan data.

回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

Archiver|小黑屋|纸聊

GMT+8, 2025-5-12 17:51 , Processed in 0.029966 second(s), 23 queries .

Powered by Discuz! X3.4

Copyright © 2001-2023, Tencent Cloud.

快速回复 返回顶部 返回列表